Los entregables del proyecto MARSOL elaborados por TRAGSA se incluyen en esta web ante el previsible cierre del dominio www.marsol.eu.
El proyecto sobre recarga gestionada MARSOL (Demonstrating Managed Aquifer Recharge as a Solution to Water Scarcity and Drought), EU FP7, terminó en 2016. Su página web sigue operativa y contiene una amplia colección de entregables en el apartado de resultados.
Results. Public deliverables of the MARSOL project.
http://marsol.eu/35-0-Results.html
Ante el el inminente cierre de este dominio web, los principales entregables de carácter público desarrollados por el Grupo Tragsa se han movido a esta web (mirror site), prolongando su accesibilidad.
WP 5. Los Arenales demo site
Deliverable 5.3 "Appropriate MAR methodology and tested knowhow for the general rural development"
MARSOL_D5-3_MAR-technology_20160731.pdf
Mirror site (enlace interno): marsol_d5-3_mar-technology_20160731.pdf (5,67 mb)
Project deliverable, 31 July 2016; activity type: report DEMO; WP 5.3
Deliverable 5.4 "Managed Aquifer Recharge to Combat Groundwater Overexploitation at the Los Arenales Site, Castilla y León, Spain"
MARSOL_D5-4_Arenales-final.pdf
Mirror site (enlace interno): marsol_d5-4_arenales-final.pdf (4,05 mb)
Project deliverable, 30 November 2016; activity type: report DEMO; WP 5.4
WP 13. Technical solutions and benchmarking
Deliverables 13.1 "MAR Technical Solutions"; and 13.3 “MAR Design and Construction Criteria” are posted as a mirror site.
Deliverable 13.1 "MAR Technical Solutions"
MARSOL_D13-1_Technical-Solutions_01062015.pdf
Mirror site (enlace interno): marsol_d13-1_technical-solutions_01062015.pdf (7,74 mb)
Project deliverable, 01 June 2015; activity type: report DEMO; WP 13.1
Deliverable 13.3 "MAR Design and Construction Criteria"
MARSOL_D13-3_MAR-Design-Criteria.pdf
Mirror site (enlace interno): marsol_d13-3_mar-design-criteria.pdf (2,81 mb)
Project deliverable, 31 October 2016; activity type: report DEMO; WP 13.3
Deliverable 13.4 "Benchmarks Evolution, Pooling and Practical Results"
MARSOL_D13-4_Benchmarking-final-report_30112016.pdf
Mirror site (enlace interno): marsol_d13-4_benchmarking-final-report_30112016.pdf (6,60 mb)
Project deliverable, 30 November 2016; activity type: report DEMO; WP 13
En el futuro próximo serán includos los entregables desarrollados en el marco del proyecto MARsolu_T (H2020, MSCA).
www.marsolut-itn.eu